Statnett fined twice for late NordLink disclosures (RME)

RME fined Statnett NOK 500,000 in 2023 for delayed and fragmented information about NordLink's ramping restrictions, and NOK 1.5 million in 2025 for disclosing a cable outage six hours after it occurred. The later decision rejected an initially proposed insider-trading finding.

On this page

The decision

Authority
Norwegian Energy Regulatory Authority (RME) (RME), Norway
Published
12 December 2025
Participants
Statnett SF
Commodity
Electricity
Market
NordLink interconnector between NO2 and Germany
Conduct period
November 2020 to October 2021 (ramping disclosures); 6 September 2023 (outage disclosure)
REMIT equivalent
Article 4 (Disclosure of inside information)
Legal basis
Norwegian NEM regulation, chapter 5 (mirrors REMIT Article 4), and Article 10 of the Transparency Regulation
Penalty
NOK 500,000 (2023) and NOK 1,500,000 (2025)
Status
Both decisions allow appeal to the Energy Appeals Board within three weeks of receipt

The 2023 decision: a ramping restriction

RME's decision of 29 June 2023 concerned NordLink's initial limit of 300 MW per hour, half the normal Nordic HVDC ramping limit. RME identified three disclosure failures: information on Statnett's website from November 2020 was not published on the NUCS market platform until 10 February 2021; a March update reached its mailing service three days before NUCS; and a decision taken in April to extend the restriction was not communicated until October, after the earlier message expired in June.

Statnett accepted shortcomings but disputed whether the information was price-sensitive inside information. It argued that ramping restrictions had modest effects and did not materially affect water values. RME held that they could change hourly flows and price expectations, including for participants who did not trade on water values. It also rejected the assumption that the market should simply continue using the last published limit. Its decision applied NEM section 5-3 and Article 11(3) of the Transparency Regulation, requiring updated ramping information.

The 2025 decision: an outage

RME's decision of 10 December 2025 concerned an outage at 04:39 on 6 September 2023 that reduced NordLink's capacity from 1,444 MW to 685 MW in both directions. Statnett prepared a NUCS message but did not publish it until 10:39. An internal message at 05:59 incorrectly indicated that publication had happened. Statnett cited heavy workload after another outage in Oesterdalen and explained that operators did not routinely check each other's tasks.

RME found breaches of NEM section 5-3 and Article 10 of the Transparency Regulation. It held that the outage information was precise and likely to influence the balancing markets and next day's auction. It rejected workload as justification: there had been about 40 minutes before the second incident, and staffing and publication checks were within Statnett's control. RME applied the one-hour reporting deadline and found no justification for later inside-information disclosure.

The penalties and the insider-trading allegation

For the 2023 fine, RME weighed repeated disclosure failures, inadequate routines and prevention against absence of deliberate conduct, substantial gain or a previous sanction for the same type of breach. It required publication on a generally known platform before Statnett's website or mailing service. Informing RME separately did not discharge the market-disclosure obligation.

In 2025 RME withdrew its proposed insider-trading finding after Statnett's response. It accepted that transactions and information-sharing solely for secure system operation fell within the TSO exception, even after an hour without publication. That exception did not remove the disclosure breach. RME set NOK 1.5 million, considering previous disclosure decisions and preventable control failures, while mitigating for no deliberate pursuit of company interests. It could not quantify the economic effects. Both decisions allowed appeal to the Energy Appeals Board within three weeks of receipt.

For a surveillance function

The decisions require disclosure controls that confirm actual publication and update expiring messages. RME distinguishes emergency system-operation duties from the duty to inform all market participants promptly through the proper platform.